India's first mission to the Sun is set for launch on September 2nd. On Saturday, ISRO chief S Somanath said that Aditya L-1 has reached Sriharikota and is prepared for launch in the first week of September. <br /> <br />"After the launch, it will take 125 days from the earth to reach Lagrange point 1 (L1). We have to wait till then," Somnath said. <br /> <br />The mission involves placing Aditya L1 in a set orbit from where it would be easy to observe different phenomenons on the Sun's surface. It will be placed in a halo orbit around the Lagrange point (L1) of the Sun-Earth system. The location is around 1.5 million km away from Earth. <br /> <br />#AdityaL1Mission #AdityaL1Launch #IndiaSolarMission #SolarMission #LagrangePoint #ISRO <br /> ~HT.178~PR.152~